Project Description
Project Description
Goreway Station in Brampton, Ontario will be an 800 megawatt combined-cycle electric generation facility located on approximately 20 hectares of industrial property on the west side of Goreway Drive, immediately north of the Canadian Tire Distribution Centre.

The Goreway Station design was specifically engineered for local environmental and community priorities. Using natural gas fuel and state-of-the-art pollution control equipment, this facility will produce power efficiently and quietly, with extremely low levels of air emissions. It has also been specially designed with advanced noise controls for quiet operation, as well as air-cooled condensers designed to keep water use as low as possible – 95 per cent less than a typical coal-fired station. Once operational, Goreway Station and its twin facility, Southdown Station in Mississauga, will be the cleanest facilities of their type anywhere in Canada.